Monitoring of the effects on the avifauna of the operation of the “TERNA ENERGY ABETE” Wind Energy Park in “Perdikokorifi” of the Municipality of Agia Varvara, Prefecture of Heraklion
P.I.: Moisis Mylonas
Duration: 1/2/2007 – 31/7/2008
Funding: TERNA ENERGY S.A. (35,101.67 €)
P.I.: Moisis Mylonas
Duration: 1/2/2007 – 31/7/2008
Funding: TERNA ENERGY S.A. (35,101.67 €)